Did some Yield 360 Soil Scan tests that showed we need to Y Drop 120 lbs nitrogen. We were planning on putting down 45 lbs of 28%. Do I believe the soil scan? Region is Central IL and soil test was taken 12" deep, pulled 6 evenly spaced plugs between the rows, yield goal 250. TIA