|
West Central MN | Yes data would transfer to the operations center automatically. That works with both 2630 and 4640. The 4640 syncs data as you go vs the 2630 sends it after you finish the operation (changing the field name trigger it to send).
You can easily replace the 2630 with a 4640, there is a kit that includes everything you need. It requires a different bracket along with a Ethernet adapter for the JDLink, and a couple other things. | |
|