|
Illinois | Using a modern, 45K lb. dozer and starting from scratch with the tile and tile riser in place, what is the most efficient step by step process to build one of these? Assume relatively limited operator experience but not bad. What part of the dam do you push up first? How do you best work around the riser? Tips for shaping the channel, smoothing up in the end, etc. This would be on IL mixed type soils, and the structures will be farmed with 30-40' equipment. It is not a government spec job. | |
|