| I was impressed with the speed at which our building was put up. The post were in the ground a week ago, Monday morning they started and finished Friday at noon. It is 50 by 108 and open to the south. Three guys with a fourth the day they put the purlins on. Adding the overhang on as an after thought added a half day to the total. Here are a few pictures.
(IMG_1958.jpg)
(IMG_1960.jpg)
(IMG_1962.jpg)
Attachments ---------------- IMG_1958.jpg (32KB - 114 downloads) IMG_1960.jpg (38KB - 117 downloads) IMG_1962.jpg (37KB - 114 downloads)
|