|
coast of Maine | Here yes,combo skid and a small excavator,most skip any snow work(PIA,you dont schedule it) with skid loader ,stump grinder(no here also),but lawn seeding,site work,septic,water lines, brush heads on excavator,less registraion and insurance costs on hauling rigging,all new rigging with in the cost of a single 32,000 lb excavator(now 200k$ min) ,you will need to work.I think if I was not farming I might do the same as I enjoy driving earth work machines. | |
|