Posted 11/30/2021 07:48 (#9350736 - in reply to #9350724) Subject: RE: CO2 pipeline
Pocahontas County, IA
Thanks for that info.
Then any extra costs to tile because you have to go around their pipeline should be figured in.
Just a thought, could a person upsize where existing tile cross to allow for more tile to be installed on the uphill side of pipeline? If that makes sense to anyone, lol