AgTalk Home
AgTalk Home
Search Forums | Classifieds (40) | Skins | Language
You are logged in as a guest. ( logon | register )

Grain Site Electrical
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
HuskerBeef
Posted 5/8/2021 08:17 (#8993571)
Subject: Grain Site Electrical


Northeast Nebraska
Going ahead with a grain site. Currently have 2 large storage bins and will be adding a pit, 2 legs, wet bin, and dryer. The site is planned for 2 additional storage bins if needed in the future.

Meeting with the electrician next week and I was wondering what some have included that they like or wished they had done to make things flow better. What are some things I need to have on the list to discuss with the electrician?

Site has 3 phase. Wanting to put an amp sensor on the pit auger for auto shutdown. Other than that what are some "nice to haves?"

Edited by HuskerBeef 5/8/2021 08:24
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)