|
NC Indiana | We had to dig around some existing field tiles and some sections of trench were so sandy we ended up barely keeping ahead of the banks caving in putting the pipe in 1 stick at a time and getting the wire set on the other side of the cut. Then we would hit a seepy area and need to back fill that section to keep the pipe from floating. Guess it depends on how much help you have and your soil conditions. | |
|