|
| Here are some pics of the routing on the newer hesston inlines. (Massey 1840)
Out of the twine box and through the tensioner. Then through the eye on needle yoke, then through the eyelet right in front of the needle underneath the bale chamber, then through the needle itself. Lastly, just bring it back and tie it off to the cross member behind the needles. The 1st time the knotter trips the needles will take it up to the knotters where the twine discs will catch it and you will be goo d to go.
Edited by Idiot Bricks 8/6/2020 11:07
(20200806_115740 (full).jpg)
(20200806_115810 (full).jpg)
(20200806_115816 (full).jpg)
Attachments ---------------- 20200806_115740 (full).jpg (233KB - 118 downloads) 20200806_115810 (full).jpg (198KB - 80 downloads) 20200806_115816 (full).jpg (231KB - 116 downloads)
| |
|