|
CIL | I built 2. My corn pit has concrete walls. An end mass conveyor(10000 per hour) sits at the bottom. We attached rubber belting to the walls to funnel the corn to the hopper on the conveyor. It's easy to remove if needed. Hopper holds about 400 bu. My bean pit is a center dump DMI wagon set on blocks with a Brandt conveyor(6000 per hour) under it. I haven't mastered getting pictures on here yet. I can text pics if anyone would like to see. Threeoninetwo7five5doubleoseven. | |
|