|
South Central Indiana | Ran out of time to pour driveway and let it cure long long enough to not crack. I will pour drive when bins are empty. Gravel was packed hard so we did not notice any getting into dump. I'm sure the tires lose some rocks while going over grates but you will get that anywhere gravel is close. I had a pretty deep area next to pit. I was concerned about it settling under concrete also. One thing I learned is that I'm no concrete man. Best to hire it done. This was quite a project to take on ourselves. It sounded simple but it was very time consuming. We have everything within 1/8" tolerance. | |
|