From what concrete I have ordered they ask "how many sacks do you want" They mean how many sack of concrete pre yard of concrete. More sack, stronger concrete, I think. Min. I have ever gotten was 5 sacks. Do you have a float? Local company here will lend you one if you need one. I would limit your strikes over the concrete to 2 if possible, no more than 3. If you go over to many times you take out to much concrete and it will be low in the middle and water will stand. |