|
![](https://talk.newagtalk.com/forums/get-attachment.asp?action=view&attachmentid=234388) south central IOWA | You want the radial lift like that one is if you're gonna do any sort of digging or bulldozing with it. Vertical lift machines are less hp and weaker frames from my understanding.
The one in Columbia needs $3,000 worth of tracks and about 2000lbs of concrete scraped off it. If it wasn't for that, it'd be a 50 plus machine.
| |
|