Posted 8/31/2018 12:02 (#6961605 - in reply to #6960617) Subject: RE: Leveling top of a foundation
Put 2 or 3 or however many you want. As said let the mortar joints level the top. Maybe a bit of mortar bed in the very lowest. Use the high points as reference for level