Posted 8/6/2018 17:01 (#6914801 - in reply to #6914720) Subject: RE: More Tire Tank Questions
WY, OK
NO. Been there done that mistake. Everything steel from the Elbow all the way up. Not even a bad idea to run last 10' in steel before the elbow. Put a good steel coupler right at top of pad height to thread fill into, do the same for drain.