| After having the DAPL come through us two years ago the best advice I can give is after they are done have the right of way pattern tiled. We have a farm where we had a new header trenches in down both sides of the ROW to connect any old tile to then we plowed 3 lines in parallel to the pipe and on that farm its barely noticeable that the pipeline went in, on other farms there is a lot more settling and seep holes. The best part is the pipeline paid for all of the new tile on that farm. | |
|