|
Montana | 10yds per truck. 300 trucks unloading in 21 minutes into a pumptruck which already like it wet to move volume. Stuff is going in the hole real fast. Telebelts can take volume but it musta been fine tuned operation. I have my doubts on the quality control, but the mix design must have been there for a project of that magnitude.
Honestly that yardage in that timeframe gives me doubts. | |
|