AgTalk Home
AgTalk Home
Search Forums | Classifieds (1) | Skins | Language
You are logged in as a guest. ( logon | register )

1st time pouring concrete questions
View previous thread :: View next thread
   Forums List -> Stock TalkMessage format
 
frekingpolypay
Posted 10/27/2017 12:27 (#6330124 - in reply to #6330008)
Subject: RE: 1st time pouring concrete questions


Southwest MN
Spend some time with a string line before you pour to make sure you won't have water standing in the middle. Used to use a groover/finisher float that was 3' wide and had 1" angle iron welded in for cleats 8" apart. Then finished afterward with a tine to roughen a little more. Seemed to work good. If the crete was set to much we would take the smallest guy on the crew and make him ride the float being pulled back.
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)