WCIL | That's what we do. Pound a pipe in the center to grade, put a long bolt edge wise in a 2x6 for a pivot, then set the board on the grade pipe and level plywood forms to that. When pouring have some helpers inside with rakes and a guy striking the cement with the 2x6. We "chop" the board up and down a little to "float" the top. No bull floats here. Not hard at all. Done 18' to 36' this way. Cheap and effective. | |
|