|
west central ohio | Have used the same style but had pipe instead of tube steel. They had nuts welded to the pipe and used rebar for stakes then ran bolt through to set grade. I would go 24" tall...mine is 18" and cheated it a bit and still fight to get swing away auger under it. Enough to do one bin at a time..30 yards would be enough for me and only $600.00
Edited by alfalfa338 6/21/2017 09:03
| |
|