|
NC KS | My setup is at home, not on a trailer. I have a 2" line from tote to a couple of T's on suction side of pump. I have a valve on each line right next to the T. I leave the line full until tote is empty. Also use valve on tote but usually close valve by T first. If you pump thick stuff such as Bicep, Lumax, etc, the 2" line handles it much better than 1" or 1 1/4". Those smaller lines take forever tomload even with water supply line partially shut off. | |
|