Posted 1/5/2017 19:08 (#5746961 - in reply to #5746844) Subject: RE: Elevator Changing discount schedules midway through contact
That is why u always make 5k to 10k bushel contracts can sell 100k but want 10/20 different contracts . Next time if make contract with them make them sign that discounts will not change with each contract .. doing smaller contracts helps with risk if entity goes belly up only have one or two contracts hauled before get check