|
![](/profile/get-photo.asp?memberid=57232&type=profile&rnd=547) West Central IL | Have a pipeline outfit wanting to survey for a 24" natural gas line. 1.5 miles of it is proposed to run across our ground. What are some things to look out for when dealing with this. Would rather they took a different route, but not sure if they can be stopped. Already in touch with our lawyer on their dime. There are 2 other proposed routes if this one doesn't work. Ours is the easiest and shortest. | |
|