Ontario's middle east | Since Jon started the year in pics thing, a few from this summers build. We broke ground on this site last weekend of June. We should be receiving corn here by next weekend.
1. This site is right near the bay of Quinte and we exposed the flat limestone and poured footings right on it.
2. Bay in the background. Since I had an abundance of rock, I drilled and blasted out our own quarry for the 20 000 t we needed.
3. These are 105' 30 ring bins with quad F aeration. 650k each
4. Pits and e room prep
5. My oldest 2 boys with me before school went back. Those guys did some serious work this summer. They twitch when they see a wire tie twister after all the rebar.
6. We are right on flight path into CFB Trenton 4 miles out
7. Installing bridges. This one is 128', 10k drag on it and weighs 20k lbs.
Edited by Maizeing 10/2/2016 04:16