Near St. Joseph Mo. and Linneus Mo. | No doubt the fella that did this should have called in and waited or had someone wait till the fix it crew got there.
Flip side is the power company should be held responsible for cost if the line was under the code height. Trust me if an individual tries to do anything with that line even if it is on their property there will be holy *ell to pay. They have made it clear to me that is their line. |