I would not settle for what you have said so far.  You mentioned the contractor said redoing the floor will  
not happen, what is up with that?    
  
I think you need a word of encouragement here, and that means have a backbone, and start whatever needs  
to be done, and do it right.  
  
I hope you have not paid more than what has been done so far.  Get tough, the contractor needs to have  
someone on site to make sure it is done right.    
  
I see lots of exposed heating tubes, so that means the floor has not been poured yet.  What are they  
cutting, the walls ? |  |
 
  |