|
Northern New York | Just built a gambrel here this summer. The lower hip we used some pre-formed flashing. Upper hip we just slid lower run of metal up under upper run of metal (we have done that on several buildings with good results). Screw metal in the valley, not on top of the rib. It's hard to maintain tension on the ribs and not cause the metal to "run". All the suppliers here recommend screwing in the valley.
(barn6.jpg)
Attachments ----------------
barn6.jpg (122KB - 1014 downloads)
| |
|