AgTalk Home
AgTalk Home
Search Forums | Classifieds (32) | Skins | Language
You are logged in as a guest. ( logon | register )

Conservation Stewardship Program
View previous thread :: View next thread
   Forums List -> Crop TalkMessage format
 
sdnotill1983
Posted 9/15/2015 07:53 (#4789930 - in reply to #4789911)
Subject: RE: ramps and such


SE SD
You get credit somewhat for what you are already doing, that is why you have to fill out the CMT. The payment is broken down into payment points for existing activity, and payment points for enhancement activity. The enhancements pay you more than the existing activity. Its broken down, look at your 1155 in your contract folder. Read below from the job sheet for ANM 38

Obstruction removal above the watering facility’s water surface.
1. All wire fencing material up to 36 inches above the water must be removed. Board and other echolocation material, at least one inch wide, may be installed at a height of at least 18 inches above the water, or
2. Rearrange the fence line to create an adjustable pivot point thereby removing any obstructions above the water surface while allowing full access to a single trough from two different grazing areas.

Edited by sdnotill1983 9/15/2015 07:57
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)