KS | Can you keep the new line in the heated space? If you can, the PEX will be your solution. I would get the water shut off asap as the running water can create long term problems under the slab. IMO, I think it should be code to run all under slab lines in conduit. Then if there is a leak, it will come out one end or the other of the conduit.
Sawing out the floor is daunting for sure but carpet and tile can cover up even worst of modifications. Either way you are going to have a mess. At least it's August instead of December. | |
|