|
s nd | I know they used to say to ping the crap out of the welds to relieve the tension on the steel and weld, but with wire welders we seldom do cause we don't have slag. Me either being a pro, but with four foot rocks and digging beets out of the ground, you get good or go home. Triple weld everything, but some frames would still break as the one pictured, just further onto the tubing. Things should be built with gussets so when you add afterwards, doesn't look like a welded up piece of equipment. Thanks for replying. | |
|