AgTalk Home
AgTalk Home
Search Forums | Classifieds (171) | Skins | Language
You are logged in as a guest. ( logon | register )

What's the correct process for building a dry dam or terrace?
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
dave morgan
Posted 2/1/2015 15:57 (#4355103 - in reply to #4355069)
Subject: RE: What's the correct process for building a dry dam or terrace?


Somerville, Indiana
+100 here on watering in the tile under the fill...Use a 4 foot schedule 40 plastic pipe or light steel, lighter the better with a valve at the top=all 2 inch...turn on water and shove the pipe down to beside the tile on each side...Spray shuttle works if can use that, hundred gallons of water usually enough, use a 2 inch Banjo pump.
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)