|
W.C. Mo. | I like to build my terraces before I install the drain tile then cut the berm where the tile runs down hill. Less chance to rip out a riser while digging the channel. I usually build the berms with a scraper so that I can cut and fill. My berms are wide based, usually 50- 60 ft or so at the base and not taller than 12" over max water height. They will not get any taller over time. Use a blade to finish. I no-till everything so usually farm right over the berm. | |
|