NW IL | You have three options:
(1) Run Ag Leader 1500 connected to Integra, and PP puck (that came from PP) connected to 20/20. So two domes on the roof.
(2) Run Ag Leader 1500 and run a serial "splitter" that takes 1 serial DB9 connection (from 1500) and splits it into two (one for Integra and one for 20/20). This would result in one dome on the roof. Using a splitter both devices would have to use the same serial settings (baud rate; Hz; etc)
(3) OR the Ag Leader 1500 technically has a port A and port B available for serial connections. The default cable provided from AL only has port A on it. I believe they make a cable that has two serial ends on it (one for A and one for B). The cable is (PN 4002304-18) and called "CABLE - GPS 1500/2500 DUAL PORT". This would result in one dome on the roof. Using the dual port cable, each device (Integra and 20/20) could have their own unique serial settings. When you go through GPS settings on the Integra and you are connected to a 1500 you will see that there are options for port A and port B.
| |
|