Posted 7/25/2008 10:33 (#421797 - in reply to #420627) Subject: Base problem.
If the ground was dry I wouldn't tile it. (:
Often here we tile in the Fall after all work is done or in the Spring before ground will work. This all equals wet ground. I now tile in standing water with the single 30.5 R2s. This would be a pipe dream with a cab.