Dallas Center IA 515-720-2463 | Take the vertical off and put a stub auger on the end. Use the same motor.
Yes you will need a truck auger, but worth it.
I have put several vertical unload augers in the iron pile in my farming career.
If you really want to speed up truck loading - Cut a hole just to the side and above where the auger comes out. Put a small truck grain gate there. Have it so the grain will run out into the hopper for the truck auger.
Start the truck auger and bin unload auger. Then open the grain gate. You will have plenty of grain.
After a couple times you will figure out how far to open the gate. No real sense in pulling all that gravity flow grain out before the center slump gets done.
Also means less to run out thru the opening over the auger. And more corn away from the door, easier to get it open. |