|
| Bear with me here, this IS a Precision Question,even though it will sound like a Machinery Question!!
Heres the scenario,,,,,,I bought a 2009 CIH 435 wheel tractor with the high output hyd pump and pto,,,,so I have 55 gpm of flow (rated)......I am pairing this with a 2010 JD 1895 with a TBH 435 bus 3 bin 1910 Cart that is GS 2 VRT.....currently this drill is setup for NH3 on the front row of Discs......I am wanting to shake things up a bit. What would it take to add a JD cart INFRONT of the drill as well, for DRY N, and be GS 2 VRT ready and strong enough to pull the rest of the "train"? I am rather new to the JD drills so am not familiar with all the carts,,,,,,,,
Goal is to be able to apply dry N, either AMS or UREA, vrt, into the front row of discs,,,,,,,Am looking for help on the cart, am aware of the opener/scraper changes and hoses/manifolds/towers , etc.....Also hoping/wondering do I have the HYD capacity to run another cart/fan?
Thanks | |
|