The black sand beaches of Jamaica, IL | I'd say that 10-14 hours is about right if you've never done one before. When I did my MX 240 it took me about 2 days messing around in the shop making sure I did everything right, the part that took me the longest was snaking the wire harness through the tractor and making sure I had it tied up and out of the way of everything. The instructions and hose kit make the connections very easy. If looking at it for billing purposes I'd say the 16 hour figure is about right on. |