Posted 10/22/2013 11:01 (#3398382 - in reply to #3398236) Subject: Re: Yield monitor installation help needed
roaming
duct-tape a line level to the top of your drill (assuming it's flat). That will get you one axis. Side to side, you can eyeball it, or stick a 90-degree welding magnet on the side of the elevator to help with the alignment.