Near-north Ontario, French River | Slyvester is doing the project for us, I believe he has his own( in house) concrete crew. The are using wire mess. Because of the location and fall of the dirt in the area we are having to do 24" minimum compacted gravel to get the barn above grade for drainage purposed. Supposed to start construction in mid October. I'm hoping sweet corn harvest is over by then so I can be around to watch the barn go up and take photos. |