How long to let concrete cure?
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
J. Sheehan
Posted 8/31/2013 13:03 (#3299774 - in reply to #3299465)
Subject: RE: How long to let concrete cure?


Sunnyside, WA
Poured 6" thick, no rebar on the end of silage pit. Waited 7 days then drove the 28,000 lb payloader on it. Just poured 80 more yards added to it and will be driving loaded tmr wagons on it after 7 days. Tractor and tmr weigh ~90,000 loaded

The longer you wait, the better. Concrete will crack. It has to. If you saw joints, it just limits the crack to mainly where the joints are located.