|
| Actually I was doing just like you do when you hit a rock except I pitched it up manually to get to a shallower depth and then went and hit install again just like after hitting a rock. The problem was that I was only about 3 ft deep and then went about 10 ft to lift to the shallower depth. If the ground went up a ft in 10 ft, I think I would have noticed it, but then again maybe all the mud made it look different. The other thing that could have messed things up is that I sunk in a bit during the survey run, but I think that would have called for a shallower depth, not a deeper one even though the actual depth would have been a bit deeper than it said I was at. | |
|