Posted 4/18/2013 19:43 (#3045890 - in reply to #3043520) Subject: Re: Slip Form Feed Bunks
western iowa,by Denison
We also throw 3 rebar in as we pour-I think last year with the concrete base and lumber+ guard rail it cost right at $15 ft-that would cover the bolts and Iron also-a guy could do it cheaper with cable-and maybe 1x12's on the outside bunk line