AgTalk Home
AgTalk Home
Search Forums | Classifieds | Skins | Language
You are logged in as a guest. ( logon | register )

DOT tie down rules
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
shaun3480
Posted 3/6/2013 22:42 (#2947673 - in reply to #2944044)
Subject: Re: DOT tie down rules


Phillips Co NW Kansas
Here in KS I believe we are required to have four tie-down points and if you have an attachment or bucket it has to have a chain over it too. Four points does not mean one chain front and rear with two boomers on each chain. It means 4 seperate chains unless your chains are long enough you can make loops out of it. My old boss was very very particular about the DOT regs and always made sure he was up to date on them.
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)