Posted 12/26/2012 21:01 (#2778116 - in reply to #2777790) Subject: Re: Grain Drying Setup
NE SD
Put U-trough on top of the bin with hanger bearinngs and you won't need to pull it down to work on it in the shop. If you're really concerned about it, buy some used catwalk and put up there. and you'll be able to access multiple bins with one staircase. You will regret an arc down the road.