|
north central ky | In the past two years we have took down probably 5 miles of fence row just like you described with my 953c. The only other machine i would rather have would be a 963c with a 4 in 1 bucket. With a crawler loader you will be able to break the limbs off the hedge trees to get into the main trunk with out busting a window or worse. I would say in two full days it could be put into two piles and graded down as long as there is no big sicamore trees. Your piles will have much less dirt with a crawler loader too. You might even look into getting a weekly rental rate from your local cat dealer and do it yourself. | |
|