| Are burning it more or less on site? Not pushing to one end or the other?
1500 might be realistic for every thing but the larger ones but you don't want the operator to knock down the 6 to 8" stuff without being sure he takes the roots out, at least I would want that. As far as the hedge goes it come out easy but some of the large roots can run a long ways out just under the surface. If you want to till this ground its best to have the dozer corner the blade and plow them up or a ripper is even better. IE: takes more time than just pushing out / piling. A big tractor could finish this part if you didn't mind putting it in those conditions????
GOOD hedge sells high around here if its straight and large enough for corners or long & straight enough for corral post. Would that be an option before clearing?