AgTalk Home
AgTalk Home
Search Forums | Classifieds | Skins | Language
You are logged in as a guest. ( logon | register )

Wire mesh or re-rod for concrete?
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
Gerald J.
Posted 4/28/2012 19:52 (#2358426 - in reply to #2356641)
Subject: Re: Wire mesh or re-rod for concrete?



For 12" spacing it would take 79 each direction. Or 79 x 80 plus a bit for splicing overlaps each way. 158 x 80' = 624 pieces 20' long. 12,840 running feet.

18" spacing would take 2/3 as much, 416 pieces 20' long, 8, 560 running feet.

Gerald J.
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)