|
WCIN | That doesn't look that bad. I have an 8.5 acre field that has 17 sides on it. With a 40' planter I try to make 2 pass around the outside of the field, and then I come back in and fill in any holes. Usually I make 2 passes all the way around the field, and then start on the straightest longest side and work across the field. This also depends if the ground pounders are still in the field, or have moved on to the next field.
| |
|