Kaukauna WI | Still can't afford it. The concrete is only 25% of the cost of the job. Our concrete bill was less than $30k but the entire bill for concrete pad, reception pit, rebar, digging, digging, digging, and more digging, laying pipe, pump to pump reception pit, electrician to wire pump (can you say $6k......totally ridiculous), etc etc etc. government plan ($7k)....... Total = $130k. | |
|