|
S.E. Iowa | Another Idea would be to use concrete tee's I made a form took it the concrete company they fill it up with concrete and i go pick them up once in a while. They charge me 35 bucks for 4 ft in length, they are 42 inches tall. You could add some pipe bars to extend it up. or even pour in the concrete. I used them in the ends of the hoop buildings. We raise hogs in the buildings but did run one group of calves thru the buildings. An advantage of the tees is you can move them if something isnt exactly right. I am not sure how the foot on the tees would work in a crowding environment | |
|